logo

Are you need IT Support Engineer? Free Consultant

Project Billing: Clarified Billing Relevance for R…

  • By Sanjay
  • 15/05/2026
  • 6 Views


Overview 

With SAP S/4HANA Cloud Public Edition release 2608, Project Billing applies a standardized billingrelevance check for projectrelated journal entries. As part of this design, journal entries posted to G/L accounts with Cost Element Category 11 (Revenues) or 12 (Sales Deduction) are excluded from Project Billing processes. 

This billingrelevance logic is evaluated consistently across all Project Billing entry points, including the Manage Project Billing app and Project Billing APIs. 

This blog explains the design principles behind this behavior, its release dependency, and the required adaptations to ensure billing continuity. 

 

System Evaluation Logic 

When a journal entry with a project reference is posted in Financial Accounting, Project Billing performs a billingrelevance evaluation based on the assigned G/L account: 

  1. For Billingrelevant G/L accounts, postings proceed to Project Billing and can result in billing requests and billing documents. 
  1. For G/L accounts with Cost Element Category 11 or 12, postings are identified and excluded from Project Billing. No billing requests or billing documents are created. 

This ensures that only eligible project costs participate in downstream billing processes. 

 

ReleaseDependent Behavior 

Release 2602.3 (CFD3) 

In release 2602.3 (CFD3), the billingrelevance check is delivered via the feature toggle PROJ_BILLG_ACCOUNT_TYPE_CHECK (Project Billing Account Type Check) 

When this feature toggle is enabled: 

  • Postings to G/L accounts with Cost Element Category 11 or 12 are excluded from Project Billing 
  • This behavior is expected and correct 
  • You can analyze the impact and adapt configuration before the standard rollout 

If billable costs appear to be missing while the feature toggle is active, this restriction is the cause. 

 

Release 2608 (Standard Behavior) 

As of the 2608 standard release: 

  • The feature toggle is removed 
  • The billingrelevance restriction becomes mandatory 
  • All tenants enforce the exclusion automatically 

From this release onward, journal entries posted to G/L accounts with Cost Element Category 11 or 12 are no longer considered in Project Billing. 

 

Example Scenario 

A projectrelated journal entry is posted with a valid project assignment, valid controlling objects, and a G/L account with Cost Element Category 11 (Revenues) or 12 (Sales Deduction) 

Outcome: 
The journal entry is posted successfully in Financial Accounting, and financial reporting remains correct. During Project Billing evaluation, the posting is excluded, and no billing request or billing document is created. This behavior is consistent and expected once the billingrelevance restriction is active. 
 
The diagram illustrates how journal entries posted to G/L account with cost element categories 11 (Revenues) or 12 (Sales Deduction) are identified by this evaluation and are systematically excluded, meaning they remain valid in Financial Accounting but do not participate in any billing process. 
 

Anushka__Khanduri_0-1778744049435.Png

 

 

Required Adaptation 

To ensure billing continuity, you must review and adapt G/L account usage for projectrelated postings. If G/L accounts with Cost Element Category 11 or 12 are currently used for billable project postings: 

  • Adjust the Cost Element Category to a value eligible for costbased billing 
  • Use appropriate cost or expense accounts intended for Project Billing integration 

Without this adaptation, affected postings will no longer be eligible for billing once release 2608 is active. 

 

Related Information 

  • SAP Support Component: PPMSCLBIL 

 

Conclusion 

With SAP S/4HANA Cloud Public Edition 2608, Project Billing enforces a standardized and consistent billingrelevance evaluation. Journal entries posted to G/L accounts with Cost Element Category 11 (Revenues) or 12 (Sales Deduction) are excluded from Project Billing across all billing channels. 

By aligning G/L account configuration with costbased billing principles, you can ensure uninterrupted and compliant Project Billing processes. 



Source link

Leave a Reply

Your email address will not be published. Required fields are marked *